An electrician completes 1/6 of a job in 2/3 hour. at this rate, how long does it take the electrician to complete the job?
2 answers:
Answer:
4
Step-by-step explanation:
- 1/6 x 2/3
- (flip 1/6 to 6/1 so its easier to calculate; they mean the same thing)
- 6/1 x 2/3 = 12/3
- 3 x 12 = 4
Hope this helps <3
<em>try to stay out of trouble lol</em>
Answer:
4 hours.
Step-by-step explanation:
2/3 * 6
= 12/3
= 4 hours.
You might be interested in
Answer:
1.103,1.13,1.1322,1.4
Step-by-step explanation:
find the decimal places and u can figure out with they are greater than this decimal or less
Download the app photo math and there is the answer
Answer:
I would say C
Step-by-step explanation:
because I think that 15 is the slope and the 35 is the y intercept. I could be wrong but that would be my guess
<span>A.
The surface area of A is greater than the surface area of B.</span>