Answer: Train A = 50 mph; Train B = 30 mph
Step-by-step explanation:
In this case, let's call the speed of both trains as:
Va: speed of train A
Vb: speed of train B
As train A is faster than train B, let's call speed of train B as X; So if Vb is X, then Va would be:
Vb = X
Va = X + 20
If we combine both Speed, we have:
V = Va + Vb = X + X + 20 = 2X + 20
Now that we have an expression for the combined speed, let's recall the formula for speed in general:
V = d/t
Where:
d: distance = 240 miles
t: time = 3 hours
Combining all the data we have:
V = 240/3
but V is 2X + 20 so:
2X + 20 = 240/3
Solving for X:
2X + 20 = 80
2X = 80 - 20
2X = 60
X = 60/2
X = Vb = 30 mph
Now that we know speed of one train, we can know the speed of the other train:
Va = 30 + 20 = 50 mph
Answer:
31ft
Step-by-step explanation:
6 ft + 2.5 ft + 12 ft + 2.5 ft + 8 ft = 31ft
I assumed the slash in the space between 2.5ft and 12ft was an error, so I ignored it in the solution to this problem.
Besides that, perimeter is found by adding all sides of the shape or figure together, and the sum of that is the perimeter.
The basic formula for perimeter is:
base + height + base + height.
I do not think you square perimeter as you do area (e.g. 31ft^2).
In division problems, if the division results in a decimal or fraction, (not a whole number), than it has a remainder. If the division results in a whole number, then there is no remainder, or a remainder of zero.
Examples:
6/3=2
6/4=1.5
Answer:
A. slope = -2; point = (8, -3)
Step-by-step explanation:
Compare to the point-slope form for slope m and point (h, k).
y -k = m(x -h)
You see that k = -3, m = -2, h = 8, so ...
- the slope is -2
- the point is (h, k) = (8, -3)
The answer is <u>Point B.</u>