Hi there
The formula is
A=pe^rt
A future value?
P present value 700
R interest rate 0.05
T time 8 years
A=700×e^(0.05×8)
A=1,044.28
Hope it helps
Answer:perpendicular
Step-by-step explanation:
Answer:
D
Step-by-step explanation:
It will take 0.4 seconds to get to the home plate.
Given:
The speed of the pitch thrown by Justin is 100 miles per hour
The distance of home plate from the pitching rubber is 60.5 feet
To find:
The time taken by a pitch to reach the home plate
Solution:
The distance home plate from the pitching rubber = d = 60.5 feet

The speed of pitch thrown by Justin = s = 100 miles/hr
The time taken by a pitch to reach the home plate = t =?
The speed of the moving object is given by dividing the distance covered from the time taken to cover that distance.

In an hour there are 3600 seconds, then in 0.000114583 hours will be:

It will take 0.4 seconds to get to the home plate.
Learn more about conversions here:
brainly.com/question/24530464
brainly.com/question/17743460
Answer:
Draw a perpendicular line from point A to line segment BC. Name the intersection of said line at BC “E.” You now have a right angled triangle AED.
Now, you know AD = 6 m. Next, given that the trapezoid is a normal one, you know that the midpoints of AB and DC coincide. Therefore, you can find the length of DE like so, DE = (20–14)/2 = 3 m.
Next, we will use the cosign trigonometric function. We know, cos() = adjacent / hypotenuse. Hence, cosx = 3/6 = 1/2. Looking it up on a trigonometric table we know, cos(60 degrees) = 1/2. Therefore, x = 60 degrees.
Alternatively, you could simply use the Theorem for normal trapezoids that states that the base angles will be 60 degrees. Hope this helps!