Answer:
$143
Explanation:
The computation of the demand forecast is shown below:
= Weightage × demand observed + Weightage × demand observed + Weightage × demand observed
= 0.1 × 120 + 0.4 × 140 + 0.5 × 150
= $12 + $56 + $75
= $143
Basically we multiplied the weighatge with its demand observed so that the demand forecast could come
Answer:
Priority programming is a process programming method based on priority. In this technique, the developer chooses the tasks to work according to priority, which is different from other types of programming, for example, a simple round-robin.
On UNIX and many other systems, higher priority values represent lower priority processes. Some of the systems, such as Windows, use the opposite convention: a higher number means a higher priority
Explanation:
Priorities can be dynamic or static. Static priorities are assigned during creation, while dynamic priorities are assigned according to the behavior of the processes while they are in the system. To illustrate, the planner could favor intensive input / output (I / O) tasks, allowing expensive requests to be issued as soon as possible.
Priorities can be defined internally or externally. Internally defined priorities make use of a measurable amount to calculate the priority of a given process. On the contrary, external priorities are defined using criteria beyond the operating system (OS), which may include the importance of the process, the type and sum of the resources used for the use of the computer, user preferences , trade and other factors such as politics etc.
Answer:
1. Apart from helping to know the average cost of a product, analyzing fixed and variable cost will help to derive the break even point.
2. Profit will go down
Explanation:
1. The size of the selling price and the variable cost determine contribution per unit of a product. Contribution per unit is Price minus variable cost. This shows the contribution of sales revenue towards covering the fixed cost of a product.
2. Relevant range is the estimated or budgeted activity level which defines a business volume of production or operation, it is both maximum and minimum threshold within which the entity must operate to expect certain level of cost and revenue.
Sometimes fixed costs are fixed within a relevant range of activities and outside such range, fixed cost may become variable, which will all things being equal impact negatively on the price.
Also, within relevant range volume discount may be achieved and outside such range, this may be forfeited which, will also reduce profit all things being equal.
C). Institutional Advertising.
I think This is correct
Answer:
Sun Smarts Solar installs solar panels in large newly constructed buildings. The company employs several expert installers who work on a full-time basis. Although the installation team works every day, the company pays them at the end of the month, for the previous month's work. Employee salaries are recorded as long-term liabilities on Sun Smarts's balance sheet.