Answer:
D
Step-by-step explanation:
Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.
Answer: 16.25%
Step-by-step explanation:
Change
650m = 0.65 km
Convert into percentage 0.65/ 4 x 100 = 16.25
Answer:
x = 6
Step-by-step explanation:
move all terms to the left:
-1.5x+12-(2.5x-12)=0
get rid of parentheses
-1.5x-2.5x+12+12=0
add all the numbers together, and all the variable.
-4x+24=0
move all terms containing x to the left, all other terms to the right
-4x=-24
x=-24/-4 - divide
x=+6