Answer:
A
Step-by-step explanation:
A is the answer A is the answer
1. P = 2(9) + 2(4.5)
P = 18 + 9
P = 27 m
2. P = 5.2(2) + 1.3(2)
P = 10.4 + 2.6
P = 13 ft
3. P = 12.9(2) + 4.7(2)
P = 25.8 + 9.4
P = 35.2 cm
The maximum value of the objective function is 330
<h3>How to maximize the
objective function?</h3>
The given parameters are:
Max w = 5y₁ + 3y₂
Subject to
y₁ + y₂ ≤ 50
2y₁ + 3y₂ ≤ 60
y₁ , y₂ ≥ 0
Start by plotting the graph of the constraints (see attachment)
From the attached graph, we have:
(y₁ , y₂) = (90, -40)
Substitute (y₁ , y₂) = (90, -40) in w = 5y₁ + 3y₂
w = 5 * 90 - 3 * 40
Evaluate
w = 330
Hence, the maximum value of the function is 330
Read more about objective functions at:
brainly.com/question/26036780
#SPJ1
First we need to know both the formula of A and B.
The formula of A is
C = 5 + 0.25p
with C representing total cost and p representing the amount of checks.
The formula of B is
C = 6 + 0.15p
with C representing total cost and p representing the amount of checks.
To find the point where A and B cost the same, we solve the following equation:
5 + 0.25p = 6 + 0.15p
Collecting terms gives us
-1 = -0.1p
Now we have to divide by -0.1 and we get.
10 = p
p = 10
So our answer: after 10 checks both accounts cost the same amount of money. Answer A.
Answer:
16 hope dat helps
Step-by-step explanation: