You need to find the slope too.
point slope formula y - y1 = m(x - x1)
use (0, -3)
y - (-3) = 1 (x -0)
y + 3 = 1x
Answer:
A real number
Step-by-step explanation:
Answer:
True
Step-by-step explanation:
A six sigma level has a lower and upper specification limits between and . It means that the probability of finding no defects in a process is, considering 12 significant figures, for values symmetrically covered for standard deviations from the mean of a normal distribution:
For those with defects <em>operating at a 6 sigma level, </em>the probability is:
Similarly, for finding <em>no defects</em> in a 5 sigma level, we have:
.
The probability of defects is:
Well, the defects present in a six sigma level and a five sigma level are, respectively:
Then, comparing both fractions, we can confirm that a <em>6 sigma level is markedly different when it comes to the number of defects present:</em>
[1]
[2]
Comparing [1] and [2], a six sigma process has <em>2 defects per billion</em> opportunities, whereas a five sigma process has <em>600 defects per billion</em> opportunities.
A=p (1+r)^t
A future value
P present value 4.98
R rate 0.04
T time
After 3 years
A=4.98×(1+0.04)^(3)
A=5.60
7.50=4.98 (1.04)^t
Solve for t
T=log(7.50÷4.98)÷log(1.04)
T=10 years
Hope it helps:-)
f is the answer hope it helps