Answer:
Option A: 12
Step-by-step explanation:
From the image of the triangle given, we can see that:
XM = ZM
We are given that:
XM = 2x + 2 and ZM = 4x - 8
Thus;
2x + 2 = 4x - 8
Rearrange to get;
4x - 2x = 8 + 2
2x = 10
x = 10/2
x = 5
Thus, XM = 2(5) + 2
XM = 12
Answer:
a=1/16 ft2
Step-by-step explanation:
1/4x1/4=1/16
Answer:
c=l/--a^2+b^2=l/--45^2+20^2≈49.24429
Step-by-step explanation:
l/-- mean square root
^ means squared/ exponent
Answer:
T = 530N + 250
Step-by-step explanation:
For the first plan, Heather will deposit $250 and then save $135 per month.
So, that is 250 + (135 x N) where N is the number of months she saves the $135.
So if it is for 3months,
We will have:
t¹ = 135N + 250
= 250 + (135 x 3)
= 250 + 405
= $655
For the second plan, there is no initial deposit, but she will save $395 per month.
That is 395 x N
t² = 395N
For 3months, we have 395 x 3 = $1185
Therefore the total for both plans in 3months = 655 + 1185 = $1840
Equation relating T to N
T = t¹ + t²
T = (135N + 250) + 395N
T = 135N + 250 + 395N
T = 530N + 250
Answer:
57.93% probability that a trip will take at least 35 minutes.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:
What is the probability that a trip will take at least 35 minutes
This probability is 1 subtracted by the pvalue of Z when X = 35. So
has a pvalue of 0.4207
1 - 0.4207 = 0.5793
57.93% probability that a trip will take at least 35 minutes.