1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
larisa [96]
3 years ago
14

A square painting has a length of 62 cm. What is the area of the painting?

Mathematics
2 answers:
Romashka-Z-Leto [24]3 years ago
8 0
What is the width of the square? 
borishaifa [10]3 years ago
7 0
62 x 62 = 3844 cm^2 
38.44 meters ^2
You might be interested in
PLEASE HELP ME ASAP I NEED TO DO THIS
yarga [219]

Answer:

1. D

Step-by-step explanation:

8 0
3 years ago
Try to figure out this riddle : An eight-digit number contains two 1's, two 2's, two 3's, and two 4's. The 1's are separated by
lord [1]
It should be 23421314
6 0
3 years ago
A travels at an average speed of 55 miles per hour on the highway. Once inside the city limits, the truck decreases its speed by
Finger [1]
Answer:33mph
Step-by-step explanation:
the speed decrease by 40%
Therefore, (100-40)%*55miles/h
60%*55
0.6*55
33mph
6 0
3 years ago
Read 2 more answers
Write an equation that represents a relationship that is not<br> proportional when m= 3 and b= -6.
Rainbow [258]

Answer:

y=3x+-6

Step-by-step explanation:

plug it into y=mx+b form

hope this helps

mark brainiest pls

4 0
2 years ago
Donatello Co. has identified an activity cost pool to which it has allocated estimated overhead of $9,600,000. It has determined
ahrayia [7]

Answer:

option (a) Widgets $2,400,000, Gadgets $1,800,000, Targets $5,400,000

Step-by-step explanation:

Data provided in the question:

Allocated estimated overhead = $9,600,000

Expected use of cost drivers for the activity = 800,000 inspections.

Inspections required by Widgets = 200,000

Inspections required by Gadgets = 150,000

Inspections required by Targets = 450,000

Therefore,

Total overhead per activity = \frac{\textup{estimated overhead}}{\textup{Total activity}}

= \frac{\textup{9,600,000}}{\textup{800,000 }}

= $12 per activity

Thus,

Overhead allocated to Widgets = 200,000 × 12 = $2,400,000

Overhead allocated to Gadgets = 150,000 × 12 = $1,800,000

Overhead allocated to Target = 450,000 × 12 = $5,400,000

Hence, The correct answer is option (a)

8 0
3 years ago
Other questions:
  • 9/10 divided by (-3/5)
    15·1 answer
  • Find the greatest comman factor of 15 and 20
    13·2 answers
  • An a electricians charges a service call fee of 50$ And then 75 hours per hour for labor. If the bill from the electrician is 42
    15·1 answer
  • 720 pt/h= ? qt/min please show step by step
    9·1 answer
  • The diagram below shows scalene triangle JKL.
    12·2 answers
  • In the 7th grade, 150 of the students are attending the dance. If this is 62.5% of the entire grade, how many 7th graders are th
    7·1 answer
  • Help on problem 7!<br> i think i have to do a2/a1 to be correct or something. please help!
    11·1 answer
  • PLZ HELP 20 PTS<br><br>Match each value to the correct entry in matrix AB.
    6·1 answer
  • Please help me asap​
    15·2 answers
  • The table below represents a function. Which of the following equations could be its function rule?
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!