Answer: True
The control chart is graph,that is used to study how a process changes over time with date plotted in time order.
Control charts are a valuable tool for monitoring process performance. However, you have to be able to interpret the control chart for it to be of any value to you.
A control chart can use to measure schedule Trends.
Step-by-step explanation: in the situation where schedule changes control chart can be use to monitor the process.
The control chart can also serve as guide that helps to notify in case of changes.
Answer:
The resulting cross section is a rectangle. SOLUTION: A plane parallel to the base of a triangular prism will intersect a cross section that is the same shape as its bases. So the cross section is a triangle.
Step-by-step explanation:
pls give me brainliest
x3 - 1/2x + 2 = 0
if you mean x³, and not x3, then heres the answer to the problem: (if it is something else please let me know)
x³ - 1/2x + 2 = 0
-2 -2
x³ - 1/2x = -2
^no side is 0 :D
Answer:
H
Step-by-step explanation:
Slope you can find by doing rise over run or using slope form.
But it is -1/4 and the y - intercept is -1.5
So it is H