GET 15 POINTS NOWWWWWWWWW!!!!

Mathematics
1 answer:
anzhelika [568]4 years ago
3 0
Slope = 2/5 ; Passes through (-4, -7) ; Point-slope form

point-slope form : y-y₁=m(x-x₁)

Simply plug everything in :)

Remember !! m=slope

y - (-7) = 2/3(x - (-4))

Simplify.

y + 7 = 2/3(x + 4)

*Some teachers want this simplified more so here's the simplest answer : 

y + 7 = 2/3x + 8/3 *

~Hope I helped!~
You might be interested in
2. Navy Height Requirement for Men: The U.S. Navy
Advocard [28]

Someone help idkthe answer

8 0
3 years ago
M5_A3. The expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7.
snow_tiger [21]

Answer:

a) 0.3520

b) 0.9884

c) 0.1292

d) 0.1292

e) 0.7648

Step-by-step explanation:

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by

Z = \frac{X - \mu}{\sigma}

After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X.

In this problem, we have that:

The expected project completion time for the construction of a pressure vessel is 18 months. So \mu = 18.

And the project variance is 7. The standard deviation is the square root of the variance, so \sigma = \sqrt{7}.

a) What is the probability that the project will require at least 19 months?

The pvalue of the zscore of X = 19 is the probability that the project will require less than 19 months. So the probability that the project will require at least 19 months is the subtraction of 1 by this pvalue.

Z = \frac{X - \mu}{\sigma}

Z = \frac{19 - 18}{\sqrt{7}}

Z = 0.38

The pvalue of Z = 0.38 is 0.6480.

So the probability that the project will require at least 19 months is 1 - 0.6480 = 0.3520.

b) What is the probability that the project will be completed within 24 months?

This is the pvalue of the zscore of X = 24.

Z = \frac{X - \mu}{\sigma}

Z = \frac{24 - 18}{\sqrt{7}}

Z = 2.27

The pvalue of Z = 2.27 is .9884. This means that the probability that the project will be completed within 24 months is .9884.

c) What is the probability that the project will require at least 21 months?

Same logic as a). We find the pvalue of the zscore of X = 21, then we subtract 1 by this value.

Z = \frac{X - \mu}{\sigma}

Z = \frac{21 - 18}{\sqrt{7}}

Z = 1.13

The pvalue of Z = 1.13 is 0.8708.

So the probability that the project will require at least 21 months is 1 - 0.8708 = 0.1292.

d) What is the probability that the project will be completed within 15 months?

Same logic as b). This is the pvalue of the zscore of X = 15.

Z = \frac{X - \mu}{\sigma}

Z = \frac{15 - 18}{\sqrt{7}}

Z = -1.13

The pvalue of Z = -1.13 is .1292. This means that the probability that the project will be completed within 15 months is .1292.

e) What is the probability that the project will take between 16 and 24 months to complete?

This is the pvalue of Z = 24 subtract by the pvalue of Z = 16.

In b), we found that the pvalue of Z = 24 is .9884

Now we find the pvalue of Z = 16

Z = \frac{X - \mu}{\sigma}

Z = \frac{16 - 18}{\sqrt{7}}

Z = -0.76

The pvalue of Z = -0.76 is 0.2236

So the probability that the project will take between 16 and 24 months to complete is 0.9884 - 0.2236 = 0.7648

8 0
4 years ago
3/5 × 2/3?... <br>alguien me ayuda que no se ._.​
yKpoI14uk [10]

Answer:

2/5

Step-by-step explanation:

3/5*2/3=6/15=2/5

4 0
3 years ago
Which of the following statements is the converse of the statement, "If each of two angles has a measure of 28 degrees, then the
kogti [31]

Answer:

  1.) If two angles have equal measures, then the measure of each is 28 degrees.

Step-by-step explanation:

The converse of a statement simply swaps the positions of the "if" and "then" clauses. Without any modification for clarity or readability, the converse would be ...

  if <em>two angles are equal in measure</em>, then <em>each of the two angles has a measure of 28 degrees</em>.

3 0
3 years ago
Find the equation of the line parallel to 2y-3x= 4 and passing through the point (6,7)
frutty [35]

Answer:

We have equation of a line:

2y - 3x = 4 => y = (3/2)x + 4

The equation of the line that is parallel to above line and passes through the point (6, 7) would have form y = ax + b, and

a = 3/2

6a + b = 7

=> b = 7 - 6a = 7 - 6 x 3/2 = 7 - 9 = -2

=> The equation of that line: y = (3/2)x - 2

Hope this helps!

:)

7 0
3 years ago
Other questions:
  • V(x)=-x^2+14x-57 I need help
    13·1 answer
  • Eight teams of high school students helped clean up trash in the community. Afterwards, they shared 23 pizzas equally. How many
    7·1 answer
  • Eighth grade
    15·1 answer
  • A car rents for $23 per day, with a $32 fee for insurance. Write an expression to determine the total cost in terms of the numbe
    14·1 answer
  • Tell which equation you would use to isolate a variable in order to solve the system using substitution. Explain your reasoning.
    13·1 answer
  • Prove: The segment joining the midpoints of the diagonals of a trapezoid is parallel to the bases.
    13·2 answers
  • Do two congruent polygons satisfy the conditions for similarity ? Why ?
    6·1 answer
  • What is ( x + y + 2 )( y + 2 )?
    11·2 answers
  • Reduce to hours and minutes 66000 seconds​
    11·1 answer
  • Write the equation for a function g(x) that is the function f(2)= |x| translated right 3 units and translated down 2 units
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!