1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
skelet666 [1.2K]
3 years ago
9

When should the sponsor-monitor conduct the most detailed review of the study protocol with the site's study staff?

Computers and Technology
1 answer:
Likurg_2 [28]3 years ago
8 0

Answer:

Site initiation visit is the correct answer.

Explanation:

Because the SIV is the sponsor-monitor which administers the detailed analysis of the site's study staff by the study protocol and it observes the process of the visite over a while that it take place after the visite of the site section. It also needed to set up the research site to administrates the analysis. So, that's why the following answer is true.

You might be interested in
A(n) _____ describes your core values and highest career goals. A. résumé B. objective statement C. qualifications profile D. pe
Juli2301 [7.4K]

Answer: D.) Personal Mission Statement

Explanation: The personal mission statement refers to a write up which is usually written by an individual and it's tailored to embody one's complete definition in terms of core values, skills, attributes and most importantly present and future desires, goals and objectives. The statement of purpose is usually detailed and will showcase where an individual is currently placed while also showcasing how he or she intends to achieve future aspiration.

8 0
3 years ago
Read 2 more answers
With respect to PERT and​ CPM, slack A. is a task or subproject that must be completed. B. marks the start or completion of a ta
Wewaii [24]

Answer:

The correct answer is C) With respect to PERT and​ CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.

Explanation:

The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.

Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.

There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.

The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.

That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.

8 0
3 years ago
You enter information by keying it into the??​
Greeley [361]

Answer:

password and username

Explanation:

3 0
3 years ago
Read 2 more answers
Which of the following is the largest disadvantage of wind power?
nydimaria [60]
The answer is     C.wind machines only generate electricity when wind is blowing
3 0
3 years ago
Read 2 more answers
Contrast the following terms (provide examples): Partial dependency; transitive dependency
kiruha [24]

Answer:

Explanation:

Transitive dependency

In this case, we have three fields, where field 2 depends on field 1, and field three depends on field 2.

For example:

Date of birth --> age --> vote

Partial dependency

It is a partial functional dependency if the removal of any attribute Y from X, and the dependency always is valid

For example:

Course and student these tables have a partial dependency, but if we have the field registration date, this date will depend on the course and student completely, we must create another table with the field registration date to remove this complete dependency.

If we remove or update the table registration date, neither course nor student must not change.

5 0
3 years ago
Other questions:
  • Which type babshshshhsshshhshshshhshs
    13·1 answer
  • Most email clients contain a ____ that allows the user to read an email message without actually opening it
    15·2 answers
  • ____ are systems in which queues of objects are waiting to be served by various servers
    5·1 answer
  • _____ is the widely used transport layer protocol that most Internet applications use with Internet Protocol (IP).
    9·1 answer
  • You can access a button s screentip by _____.
    6·1 answer
  • Lin wants to play an online game with her friends. She read the description of the game and knows it contains several features w
    12·1 answer
  • Write a program that estimates how many years, months, weeks, days, and hours have gone by since Jan 1 1970 by calculations with
    15·1 answer
  • There are many commercially made household linens found in the?
    7·1 answer
  • ProgrammingAssignment3
    8·1 answer
  • Question: 4/8
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!