The equation of the line will be (assuming the y-intercept equal to zero):
y = 2.5*x
<h3>
What is Tahila's mistake?</h3>
We know that we have a linear equation of the form:
y = a*x + b
Such that we know that the line passes through (-3, -7.5), notice that the proposed equation is:
y = 0.5*x
If you evaluate that in -3, you get:
y = 0.5*-3 = -1.5
So this line does not pass through (-3, -7.5).
If we assume that b = 0 in the linear equation, then we can find the value of a as:
-7.5 = a*-3
a = 7.5/3 = 2.5
Then the linear equation is:
y = 2.5*x
If you want to learn more about linear equations:
brainly.com/question/1884491
#SPJ1
Answer:
B.6x+4=7
Step-by-step explanation:
x represents how many miles is around her school building which she did 6 times, 4 miles is for the amount she ran home and 7 miles is the combination of the 6 times the miles around her school, 6x and the miles she ran home 4
making the equation 6x+4=7
Diametre = 2 x Radius
Radius = 7
Circumference = 2πr
= 2x22/7x7
= 44
Answer:
C. $97
Step-by-step explanation:
The average of his wage for all 15 days is the sum of all wages for the 15 days divided by 15.
average wage for 15 days = (sum of wages for the 15 days)/15
The amount of wages during a number of days is the product of the average wage of those days and the number of days.
First 7 days:
average wage: $87
number of days: 7
total wages in first 7 days = 7 * $87/day = $609
Last 7 days:
average wage: $92
number of days: 7
total wages in last 7 days = 7 * $92/day = $644
8th day:
wages of the 8th day is unknown, so we let x = wages of the 8th day
total wages of 15 days = (wages of first 7 days) + (wages of 8th day) + (wages of last 7 days)
total wages of 15 days = 609 + x + 644 = x + 1253
average wage for 15 days = (sum of wages for the 15 days)/15
average wage for 15 days = (x + 1253)/15
We are told the average for the 15 days is $90/day.
(x + 1253)/15 = 90
Multiply both sides by 15.
x + 1253 = 1350
Subtract 1253 from both sides.
x = 97
Answer: $97