Answer:
-3p-40
Step-by-step explanation:
-(7p+6)-2(-1-2p)
-7p-42+2+4p
-3p-40
A.) y = ut - 1/2gt^2 + 12
y = 6t - 1/2(9.8)t^2 + 12
y = 6t - 4.9t^2 + 12
b.) The y-intercept is 12
c.) The y-intercept represent the height of the ball at time t = 0
d.) At the time the ball reaches the ground, y = 0
-4.9t^2 + 6t + 12 = 0
t = 2.29 seconds
Therefore, it took the ball 2.29 seconds to reach the ground.
Answer:
Step-by-step explanation:
If the new fraction is 8/12 I will show how to find it.
Let's say the original denominator is x, then the numerator is x-4, so we have (x-4)/x.
Then it says f we add 4 to both, so now we have x/(x+4) this equals 8/12. Now, keep in mind -4 cannot be an answer because it would make x/(x+4) be divided by 0 which wouldn't exist.
Now we just use algebra.
x/(x+4) = 8/12
12x = 8(x+4)
12x = 8x + 32
4x = 32
x = 8
So the original fraction (x-4)/x = (8-4)/8 = 4/8
The initial fee of $50 is essentially the y intercept because this is the value when x = 0 (x is the number of labor-hours). So b = 50.
The slope is m = 30 because each increase of 1 hour leads to the cost bumping up by 30 dollars. In other words, slope = rise/run = (change in cost)/(change in hours) = 30/1
So we plug m = 30 and b = 50 into the y = mx+b formula to get y = 30x+50
Replace y with f(x) to get f(x) = 30x+50
The linear function for the cost is f(x) = 30x+50
Note: Some books may use other letters (instead of x and f(x)), but the idea is still the same
Once you know the cost function, you replace x with 4.5 to find the amount it will cost to have a painter work for 4.5 hours.
f(x) = 30x+50
f(4.5) = 30*4.5+50
f(4.5) = 135+50
f(4.5) = 185
It will cost 185 dollars to have the painter work for 4.5 hours
In order to answer this, we need an image to be able to see what they look like.