Answer:
$114.75
Step-by-step explanation:
You have to multiply the hours by the wage. Looking at the time that the worker was in during the morning, it was a total of 4 hours. Since the wage is $13.50/hr, we would multiply 13.50 by 4.
13.50 * 4 = 54.00
So, now we have to add together the total hours in the afternoon. If we count the time, we get 4 1/2 hours. So, now we multiply 13.50 by 4.5.
13.50 * 4.5 = 60.75
Now, to find the total pay for that day, we add both the morning and the afternoon pay together.
54.00 + 60.75 = 114.75
Therefore, the pay for this day is $114.75.
Yes, more than a whole pizza was eaten. This is because if you simply look at the fractions, you will see that both are greater than 1/2 and so combined, they would be greater than 1.
Answer:
a little late
205 1/5 is your answer
Step-by-step explanation:
break down the 3-D figure
Find area of triangle A=1/2bh
=1/2(8 inch)(6 9/10inch)
=1/2(8 inch)(69/10 inch)
=138/5 square inch
then multiply two because you have 2 triangles
=138/5 (2)
= 276/5 square inch
= 55 1/5 sq.in
Find area of rectangle
A = lw
=6 1/4 in (8 in)
= 25/4 (8 in.)
= 50 sq. in.
then multiply by 3 because of the three rectangles
= 50 sq. inch (3)
= 150 sq. in.
Add all together
55 1/5 sq. inch + 150 sq. inch = 205 1/5 sq. inch