1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Rus_ich [418]
3 years ago
5

The function p(x)= -2000x^2 + 16000x - 5000 models the monthly profit P of a smoothie company, where x represents the price per

smoothie. Identify the price range that will generate a monthly profit of at least 25,000?
a. between $3 and $5, inclusive
b. less than $3
c. more than $5

Mathematics
1 answer:
kicyunya [14]3 years ago
5 0
Attached solution with steps.

You might be interested in
Tonya has a small picture with a length of inches. She wants to enlarge the picture by a factor of 7 and frame it. Which of the
Elena L [17]
Enlarge the picture 7 times by inches
3 0
3 years ago
The zeros of a quadratic function are -8 and 5. Write the quadratic function in Standard Form.
nataly862011 [7]

Answer:

y = x² + 3x - 40

Step-by-step explanation:

Given the zeros are x = - 8 and x = 5, then the factors are

(x + 8) and (x - 5) and

y = (x + 8)(x - 5) ← expand factors

y = x² - 5x + 8x - 40, hence

y = x² + 3x - 40 ← in standard form

7 0
2 years ago
Alexis sold boxes of homemade granola bars for $8.50 each. It cost her $2.25 to bake and package each box of granola bars. What
scZoUnD [109]

Answer: 6.25 is her profit

Step-by-step explanation: cost-price= protect

2.25 - 8.50=6.25

4 0
3 years ago
A cracker manufacturer wants to know how a new cracker she wants to make compares to the competition, so she has people in a sam
mrs_skeptik [129]

Answer:

I believe the answer would be survey seeing as other people would be trying all three and comparing one to the other two


5 0
3 years ago
Read 2 more answers
It takes 8 workers 5 hours to build 2 cars. Assuming they work at the same speed , how long does it take 2 workers to build 8 ca
vodomira [7]

Answer:

80 hours   for 2 workers  to build 8 cars

Step-by-step explanation:

2 cars / 8w *5 hr  =   2 cars / 40 hrs    1 car takes 20 hrs

8 cars * 20 hours = 160 hours required

 two workers split this time    160/2  = 80 hours

8 0
2 years ago
Other questions:
  • Estimate 3/4% of 168​
    15·1 answer
  • What does mean time as many
    15·1 answer
  • In the​ 1970s, due to world​ events, there was a gasoline shortage in the United States. There were often long lines of cars wai
    14·1 answer
  • Find the accumulated amount a, if the principal p is invested at an interest rate of r per year for t years.
    6·1 answer
  • What must be true if <img src="https://tex.z-dn.net/?f=%5Cfrac%7Bx%7D%7By%7D" id="TexFormula1" title="\frac{x}{y}" alt="\frac{x}
    5·1 answer
  • Yall help im drowning in work. 19 = 4a − 12
    14·2 answers
  • How much interest will you pay on a loan of $2,620, with a 3% interest rate, paid over 5<br> years?
    10·1 answer
  • The measure of 6is 120 the Meade of 5 is 100 what is the measure of 4
    15·1 answer
  • 46°<br> X<br> Х<br> X =<br> degrees.
    12·2 answers
  • If james hand is 0.17 meters and junes is 0.165 who have the Bigger hand
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!