1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
IrinaK [193]
3 years ago
9

Finish the sentence. Pack in the mail, _________

Mathematics
2 answers:
Ostrovityanka [42]3 years ago
6 0

Answer:it gone hum????

Step-by-step explanation:is that dababy

slamgirl [31]3 years ago
5 0

Answer:

It's Gone

Step-by-step explanation:

You might be interested in
I hope it’s clear enough but can some please help
Liula [17]

Answer:

b

Step-by-step explanation:

hope this helps you! have a good day!

6 0
3 years ago
A slitter assembly contains 48 blades. Five blades are selected at random and evaluated each day of sharpness. If any dull blade
Alex73 [517]

Answer:

Part a

The probability that assembly is replaced the first day is 0.7069.

Part b

The probability that assembly is replaced no replaced until the third day of evaluation is 0.0607.

Part c

The probability that the assembly is not replaced until the third day of evaluation is 0.2811.

Step-by-step explanation:

Hypergeometric Distribution: A random variable x that represents number of success of the n trails without replacement and M represents number of success of the N trails without replacement is termed as the hypergeometric distribution. Moreover, it consists of fixed number of trails and also the two possible outcomes for each trail.

It occurs when there is finite population and samples are taken without replacement.

The probability distribution of the hyper geometric is,

P(x,N,n,M)=\frac{(\limits^M_x)(\imits^{N-M}_{n-x})}{(\limits^N_n)}

Here x is the success in the sample of n trails, N represents the total population, n represents the random sample from the total population and M represents the success in the population.

Probability that at least one of the trail is succeed is,

P(x\geq1)=1-P(x

(a)

Compute the probability that the assembly is replaced the first day.

From the given information,

Let x be number of blades dull in the assembly are replaced.

Total number of blades in the assembly N = 48.

Number of blades selected at random from the assembly  n= 5

Number of blades in an assembly dull is M  = 10.

The probability mass function is,

P(X=x)=\frac{[\limits^M_x][\limits^{N-M}_{n-x}]}{[\limits^N_n]};x=0,1,2,...,n\\\\=\frac{[\limits^{10}_x][\limits^{48-10}_{5-x}]}{[\limits^{48}_5]}

The probability that assembly is replaced the first day means the probability that at least one blade is dull is,

P(x\geq 1)=1- P(x

(b)

From the given information,

Let x be number of blades dull in the assembly are replaced.

Total number of blades in the assembly  N = 48

Number of blades selected at random from the assembly  N = 5

Number of blades in an assembly dull is  M = 10

From the information,

The probability that assembly is replaced (P)  is 0.7069.

The probability that assembly is not replaced is (Q)  is,

q=1-p\\= 1-0.7069= 0.2931

The geometric probability mass function is,

P(X = x)= q^{x-1} p; x =1,2,....=(0.2931)^{x-1}(0.7069)

The probability that assembly is replaced no replaced until the third day of evaluation is,

P(X = 3)=(0.2931)^{3-1}(0.7069)\\=(0.2931)^2(0.7069)= 0.0607

(c)

From the given information,

Let x be number of blades dull in the assembly are replaced.

Total number of blades in the assembly   N = 48

Number of blades selected at random from the assembly  n = 5

Suppose that on the first day of the evaluation two of the blades are dull then the probability that the assembly is not replaced is,

Here, number of blades in an assembly dull is M  = 2.

P(x=0)=\frac{(\limits^2_0)(\limits^{48-2}_{5-0})}{\limits^{48}_5}\\\\=\frac{(\limits^{46}_5)}{(\limits^{48}_5)}\\\\= 0.8005

Suppose that on the second day of the evaluation six of the blades are dull then the probability that the assembly is not replaced is,

Here, number of blades in an assembly dull is M  = 6.

P(x=0)=\frac{(\limits^6_0)(\limits^{48-6}_{5-0})}{(\limits^{48}_5)}\\\\=\frac{(\limits^{42}_5}{(\limits^{48}_5)}\\\\= 0.4968

Suppose that on the third day of the evaluation ten of the blades are dull then the probability that the assembly is not replaced is,

Here, number of blades in an assembly dull is M

= 10.

P(x\geq 1)=1- P(x

 

The probability that the assembly is not replaced until the third day of evaluation is,

P(The assembly is not replaced until the third day)=P(The assembly is not replaced first day) x P(The assembly is not replaced second day) x P(The assembly is replaced third day)

=(0.8005)(0.4968)(0.7069)= 0.2811

5 0
4 years ago
The points plotted below are on the graph of a polynomial. In what range of x-values must the polynomial have a root?
joja [24]

Actually, I think the question should be, "In what range(s) of x-values must there be a root of the POLYNOMIAL?" Unless you are working with some real strange maths, polynomials are smooth and continuous. If you drew a smooth and continuous line through the points in the graph, where would the line have to cross the x-axis?


6 0
3 years ago
True or False: The relation {(3, 2), (1, 2), (7, –5), (11, 6), (17, –4), (13, 8)} is a function.
8090 [49]

Answer:

False

Step-by-step explanation:

This is because if you have a function which is Y=2x-4 , then trying to give an example using the given points which (3,2) , here we will have Y=2 upon replacing 3 in the function cause 3 is the value of x and vice versa if we have 2 as the value of Y then x will be 3 . However,if we get the (1,2) the answer for Y will be -2 which is different from the one we have in the question hence this concludes false

7 0
3 years ago
The following equation:
eimsori [14]

Answer:

all I know is p = 3511

Hope's it helps

6 0
3 years ago
Other questions:
  • 3X3X3X3X3X3X3=? Please help me
    7·2 answers
  • What is the distance from the origin of point P graphed on the complex plane below?
    15·2 answers
  • Rewrite (x+4y)(2x+y-9) using distributive property
    5·1 answer
  • How to put a linear equation into standard form
    13·1 answer
  • 24.94 is 29% of what number? plz help
    6·1 answer
  • Someone help and plz make sure it’s right :)
    13·2 answers
  • Which of the following will simplify to the
    6·1 answer
  • Use Newton’s method to approximate the indicated root of the equation correct to six decimal places. The positive root of 3 sin
    7·1 answer
  • the ages of six boys are given as 12 years 3 months, 18 years, 13 years 7 months, 17 years 2 months 15 years and 14 years respec
    9·1 answer
  • True or False: Every fraction has a limited number of equivalent fractions.
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!