Answer:A conversation between co-workers
Explanation:
Answer:
A.
Explanation:
A well designed high-volume system will minimize work-in-process (WIP) inventory and reduce lead time for the product.
Work in process (WIP) are partially finished products. WIP inventory could be minimized by designing a suitable high-volume system.
Lead time or throughput time is the time taken for a product to be manufactured or processed. A well designed high-volume system would reduce throughput time.
Answer:
conductor
A semiconductor is a material that can carry an electric current between a conductor and an insulator.
Materials
materials are the only physical thing