Step-by-step explanation:
cost per day
= $1500 / week
= $1500 / 7 days
= $1500 ÷ 7 / 7 ÷ 7
≈ $214,29 / day
A number that would be rounded to 700 would be 695. if i'm wanting to round to the nearest hundred then i would look at the number behind the number i'm rounding so i would look at 9. 9 is 5 or more so we round up to 700.
<span />
Umm what’s the question??
.004052
___________
76255) 309.00000
305.020
_______
4.98000
3.81275
__________
1.16725