Answer:
(D) because you cannot sell shells.
Answer: Extra safety that is applied to a project immediately before the use of the constrained resource.(D)
Explanation:
Drum buffer can be explained as period of time that is used to safeguard the drum resource from the problems that occur from the drum operation.
The aim of the drum buffer effect is to provide a recheck of the work in order not to deviate from the real aim of the project. The buffer makes up for the process variation, and makes the project stable as it gives extra safety which is applied mmediately before using constrained resource.
Answer:
From a cost savings perspective the switch should be made in-house
Explanation:
In deciding whether Cool Systems should make or buy the switch , we calculate the relevant applicable to both situations,then compare t see which option saves costs.
The cost of making the switch is calculated thus:
Direct materials per unit $5
Direct labor $3
Variable overhead <u>$6</u>
Total relevant cost <u> $14</u>
The cost of purchasing the switch from another supplier is $15
From the above analysis, it is preferable to make the switch in-house as that option saves $1($15-$14) per switch.
However, it might be that we need to look beyond cost savings sometimes,purchasing the switch from another supplier might be viable if the quality of the outside switch is better or that the outside supplier can deliver in timely fashion.
Answer:
unique prroducts
Explanation:
A product is a commodity when all units of production are identical, regardless of who produces them. However, to be a differentiated product, a company's product is different than those of its competitors. On the continuum between commodities and differentiated products are many degrees and combinations of the two.