2 points=2%=0.02
205000×0.02=4,100 cost of 2 points
Closing costs is
4,100+450+575+600
=5,725....answer
Hope it helps!
        
                    
             
        
        
        
Answer:
The answer is C. 8 mm
Step-by-step explanation:
For me, i was able to divide the 80 by 12 and get 6.667 thus i was able to round up and conclude the answer in the answer choices
 
        
                    
             
        
        
        
So for this, you'll be using the pythagorean theorem, which is  . In this case, 10 and 24 are the legs, and AB is the hypotenuse. Our equation will be
 . In this case, 10 and 24 are the legs, and AB is the hypotenuse. Our equation will be 
Firstly, solve the exponents: 
Next, combine 100 and 576: 
And lastly, square root both sides to get 
And in short, Line AB is 26 ft, or the first option.
 
        
             
        
        
        
Answer:
Step-by-step explanation:
a) (a + b)² = (a + b) * (a +b)
   (a + b)³  = (a + b) * (a +b) * (a +b)
  a²- b² = (a +b) (a - b)
Here (a + b) is common in all the three expressions
HCF = (a + b)
b) (x - 1) = (x - 1)
   x² - 1  = (x - 1) * (x + 1)
   (x³ - 1) = (x - 1) (x² + x + 1)
HCF = (x -1)