The correct answer in the blank is the edge cities. The edge cities describe the following statement above because building like malls, hotels, parks and even residential areas that are found near to the major high ways intersections are called to be it.
Inflation and Periods of Depression are the two main economic problems that keynesian economics seeks to address. So the answer in this question is Periods of depression and inflation. There are so many economic problems but the main is Inflation and Periods of Depression.
The investments today’s worth is $203001.61.
We have to calculate the future value of the investments. So we can use the formula,
A=P (1+r/100)ⁿ
Where, A stands for future value, P stands for Present value, R stands for Interest rate, n stands for Time period.
Interest rate (r) = 5%= 0.05 and Time period is from 1912 to 2020 so, it is equals to 108 years. (2020-1912year)
On putting the values in the above formula we get,
A = 1000× (1+ 5/100)^108
=1000*203.001612
=$203001.61
The worth of a current asset at some point in the future based on an estimated rate of growth is known as future value (FV). The future value calculation enables investors to forecast, with varying degrees of accuracy, the amount of profit that can be generated by various investments.
Investors and financial planners use the future value to estimate how much an investment made today will be worth in the future. The future value equation is used to assess various possibilities since the growth produced by holding a given amount in cash will probably differ from that produced by investing that same amount in equities.
To learn more about future value, refer this link.
brainly.com/question/24703884
#SPJ4
The answer is a half second to five seconds.
The brainest answer would be appreciated.
Answer:
c. $1,740 F
Explanation:
The
is the measure of the
between the amount of materials that is used in actual for the production process and the amount of the material that was expected or estimated to be used in the production process.
It is given that the Snuggs Corporation applies the variable overhead on direct labor hour basis.
Therefore, the SQ = 2.8 ounces per unit x 1100 units = 3080 ounces
The materials quantity variance = (AQ - SQ) x SP
= (2790 ounces - 3080 ounces) x $ 6 per ounce
= (-290 ounces) x $ 6
= $ 1740 F