Answer:
a. Terrell's Optimal Capital Structure is 40:60. It means to obtain optimal capital structure in-order to increase value of firm, Terrell should finance 40% of its Assets through Debt and remaining through Common Equity.
b. The optimal Capital Structure is the point where company's WACC is minimized. So, 40:60 is the ratio where Terrell's WACC will be minimized.
Explanation:
The goal of Management is to increase Shareholders' wealth and not to generate profits because wealth is something that is for long-run whereas Profits are temporary. Management would accept projects having negative NPV if its goal is to maximize Profit.
Maximizing Shareholders' wealth means to increase the Share Price whereas Generating a higher EPS is Profit Maximization Strategy. So, you should look for that Capital Structure Point where the Company's Stock Price is Highest.
Thanks!
The systems development life cycle in which model developers use a model to generate functional requirements and physical design specifications simultaneously is:
<h3>What is a Model?</h3>
This is a prototype which is used to represent a real thing to show the real life scenarios and applications on a much smaller scale.
With this in mind, we can see that in the prototyping life cycle, the model developers make functional requirements simultaneously to find out how the physical design specifications would look like.
Read more about life cycle here:
brainly.com/question/25754149
Answer:
B. Both I and II are true.
Explanation:
<em> The average total cost of a given level of output is the slope of the line from the origin to the total cost curve at that level of output</em>
The average total cost is defined as the sum of all total costs divided by the quantity produced. In other words, the cost of one unit of production. The average cost curve as shown in the diagram is U-shaped, where it falls with economies of scale and later rises as diseconomies of scale sets in.
<em />
<em>The marginal cost of a given level of output is the slope of the line that is tangent to the total cost curve at that level of output</em>
Marginal cost is the change that occurs in the total cost when quantity produced increases by one unit. In other words, it is the cost of producing an additional unit of a good. As per the diagram, the slope of the line tangent to the TC (TC = AC x Q1) curve at Q1 is the firm's marginal cost at this output level.
I believe the correct answer is Payment, because if the worker receives $500 EVERY TWO WEEKS it most likely means that is his payment or what he is employed for
Take 40 over a 100 as a fraction and 3000 over 1 as a fraction and multiply them. 3000 multiply by 40 is =120000 and divide that by 100 would be 1200
$1200