Answer:
The answer to this question is given below in the explanation section.
Explanation:
The correct answer to this question is the planning stage. Because the planning stage represents the development of documents that provide the basis for acquiring the resources and for developing the requirement document. at this stage, you plan about what you are going to develop and how to develop it. At this stage, you come out mainly with two documents i.e. project proposal and requirement document.
Other options are not correct because:
In the project management, after planning, you will start designing the product, and after designing you start developing the product, and at the implementation stage, you implement or deploy the product to the customer or to the client. The requirement document that is developed at the planning stage can be used in the later stages of the project.
The Graphical User Interface was invented by <span>Xerox PARC by </span>Alan Kay<span>, </span>Douglas Engelbart
Solution:
Look at the tabs and hover over images. are two great ways to find clues to locate commands on the ribbon.
There are six main categories for command which are; one-click, toggle, split buttons, drop-down and tick box. Categories can be mixed so it is useful to understand the basics to develop the Excel skills.
The ribbon is a user interface element created by Microsoft, which was introduced with Microsoft Office 2007. It is part of the "Microsoft Office Fluent" interface and combines the menu bar and toolbar into a single floating pane. By default, it is located at the top of the screen in Office applications, such as Access, Excel, PowerPoint, Word, and Outlook.
This is the required solution.