<span>My responsibility in this activity within the community is to develop a new community or a new type of neighborhood with new responsibilities and aptitudes. I can face problems and setbacks due to criticisms and complaints that do not bring benefit to the work, however, I can meet positive and optimistic people. As the plan unfolds there are several steps that arise from the initial idea and project guidelines, the construction contains an elaborate and detailed plan and a schedule of activities for each worker. In these guidelines are marked the possible solutions to different types of problems found throughout the work. Transportation, labor, materials and especially the budget. For this there is a list of problem solvency codes and norms and guidelines established for each situation. The citizens of this community will be satisfied with the result.</span>
It was built to create a navigable water route from New York City to the Great Lakes.
<span>Atmospheric pollution has drastic effects on the health and well-being of people, plants, and animals on Earth.
</span>
Natural cracks in the rock that form due to the exhumation of deeply buried rock are called salt wedges.
Answer: Option 1
<u>Explanation:
</u>
The process of exhumation in the discipline of Geography refers to digging up of a buried rock due to natural forces applied on the surface under which the rock is buried. At a salt wedge, a river flowing with a great velocity meets the ocean where the ocean is comparatively calm.
The fast-flowing river water acts as a digging force and carries out the process of exhumation of the rocks at the wedge. The same fast-flowing water creates cracks in the exhumed rocks.
loose fragments of rocks and minerals are refereed to as sediments