Answer:
Step-by-step explanation:
a: Wrong. The first thing that you have to notice is that the sum goes to infinity. If you want k=4 to be the last condition, then take out the 3 dots.
b: That's the answer.
c: wrong. You get a real mess when you let set k = 0. Try it on your calculator.
1 ÷ 0 = Watch carefully as your calculator mentally melts down.
d: wrong. It's just not right. The highest power is k^2. There is no way to get k^3
Answer:
b
Step-by-step explanation:
done it
Answer:
296.89 m
Step-by-step explanation:
assuming that both the buildings are on level ground (i.e their bases are at the same elevation), see attached.
Answer:
The cut-off dollar amount is $328.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Mean cost of $328, standard deviation of $82.
This means that 
If you want to be in the bottom 50%, what will be the cut-off dollar amount?
The 50th percentile, which is X when Z has a pvalue of 0.5. So X when Z = 0.




The cut-off dollar amount is $328.