1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
aksik [14]
2 years ago
5

Why does sodium hydroxide solution affect the requirements for photosynthesis?

Biology
1 answer:
Jet001 [13]2 years ago
4 0
This is because the photosynthesis require optimum pH to be slightly alkaline. Bases, such as sodium hydroxide (NaOH), are necessary to raise the pH to levels that are ideal for photosynthesis to occur. 

Since, pH in soil, fresh water or groundwater becomes acidic, plant uptake and photosynthesis rates decrease.  Sodium hydroxide (NaOH) raises pH levels and can affect photosynthesis rates.

You might be interested in
During an annual checkups the doctor typically feels the lymph nodes for swelling. What would swelling in the lymph node most li
marshall27 [118]
It could mean that you have an infection or are starting to get sick
4 0
3 years ago
in the human nervous system, what is a synapse? A. The difference in ionic charge between the inside and outside of a neuron B.
LenaWriter [7]

Answer:

D

Explanation:

For more info, try specifically researching about synapse junctions

6 0
3 years ago
Question 13
zysi [14]

Answer:

contain only prokaryotic organism.

6 0
2 years ago
What happens if 4 bears try and live in the same area?
aivan3 [116]

Answer:there is two answers the bear could fight or be friend if they are the same race

Explanation:

What could happen if this is if they are different bears, what could happen is that a fight is started to see who gets that area, but if they are bears of the same race, for example a brown bear, as much as possible it would be that they will not fight and were friends or another probability would be that they will fight

 

3 0
3 years ago
What is the estimated expected (mean) time for project completion?
il63 [147K]
The estimated expected (mean) time for project completion is 50 weeks, time management includes all the activities necessary to achieve the target date of delivery of the project. It includes the following activities: identification of activities, logical sequencing of activities, estimation of duration of activities, and preparation of the project schedule. For the preparation of the schedule we will see various methods such as resource leveling, simulation, and the critical chain method.
3 0
2 years ago
Other questions:
  • A decrease in the oxygen-carrying ability of the blood, for any reason, is a condition known as ________.
    5·1 answer
  • When a nurse becomes too emotionally attached to her​ patients, it becomes difficult for her to do her job effectively?
    7·1 answer
  • What are the 4 major types of organic molecules
    10·1 answer
  • What happens right before RNA polymerase begins to work
    7·2 answers
  • Calculate the mass of 0.35 mole of copper (||) sulfate (CuSO4). <br>​
    15·1 answer
  • Which is true?
    8·2 answers
  • SOMEONE SMART PLS HELP!!!!! If 1 kg of fuel is used in the above fusion reaction, the resulting helium has a mass of 0.993 kg. I
    10·1 answer
  • 2.Which of the following is the appropriate time for pruning fruit trees?
    5·2 answers
  • What are the factors that influence the delivery of health care services in Zambia
    10·1 answer
  • What types of weather events are not yet clearly linked to climate change?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!