improper you need to simplify which would become 2 and 2/3
Answer:
1. x=1
2. x=7
Step-by-step explanation:
1. -8(1+4x)+7x=-25-8x
-8-32x+7x=-25-8x
8x-32x+7x=-25+8
-17x=-25+8
-17x=-17

2. -5+6(x-7)=-40+5x
-5+6x-42=-40+5x
-47+6x=-40+5x
x=47-40
x=7
8 feet
If 1 inch is 4 feet, multiply 4 times 2, and you will get 8.
Answer:
(a). 72.9%.
(b). 13.6 hr.
Step-by-step explanation:
So, we are given the following data or parameters or information which is going to assist us in solving this question/problem;
=> "A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly takes 45 minutes (unit time). "
=> The worker produces 10 welded assemblies on the second day, and the 10th assembly on the second day takes 30 minutes"
So, we will be making use of the Crawford learning curve model.
T(7) + 10 = T (17) = 30 min.
T(7) = T1(7)^b = 45.
T(17 ) = T1(17)^b = 30.
(T1) = 45/7^b = 30/17^b.
45/30 = 7^b/17^b = (7/17)^b.
1.5 = (0.41177)^b.
ln 1.5 = b ln 0.41177.
0.40547 = -0.8873 b.
b = - 0.45696.
=> 2^ -0.45696 = 0.7285.
= 72.9%.
(b). T1= 45/7^ - 045696 = 109.5 hr.
V(TT)(17) = 109.5 {(17.51^ - 0.45696 – 0.51^ - 0.45696) / (1 - 0.45696)} .
V(TT) (17) = 109.5 {(4.7317 - 0.6863) / 0.54304} .
= 815.7 min .
= 13.595 hr.
The answer would be to divide 1030 by 50 and you would get 21 coaches not 20 because 50x20=1000 and there are 30 remainder. Therefor, you would need that extra coach with some seats left to spare. so your answer is 21 coaches