1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
stira [4]
3 years ago
5

Which graph represents the linear function y= -5x + 2

Mathematics
1 answer:
Semmy [17]3 years ago
7 0
Look at all the options... the correct one should have a negative slope (so it would be a line decreasing), and it should also intersect on the Y axis at 2.

You might be interested in
Will mark brainliest if right. Thank you.
Delicious77 [7]

Answer:

Step-by-step explanation:

sides of triangle are (4+3) and (2+3)

or 7,5

area of triangle=1/2×7×5=35/2=17.5 cm²

area of rectangle=3×2=6 cm²

area of shaded region=17.5-6=11.5 cm²

4 0
3 years ago
Pineapples cost $2.50 each and mangos cost $1.50 each. Tim purchased 15 pieces of fruit for $29.50. How many pineapples and how
kotykmax [81]
We can create equations to solve this.

2.50p + 1.50m = 29.50
p + m = 15

Solve for a variable in the 2nd equation and use the substitution method to solve.

p + m = 15

Subtract p to both sides:

m = -p + 15

Plug in -p + 15 for m in the first equation.

2.50p + 1.50(-p + 15) = 29.50

Distribute:

2.50p - 1.50p + 22.50 = 29.50

Combine like terms:

p + 22.50 = 29.50

Subtract 22.50 to both sides:

p = 7

Now plug this into any of the two equations and solve for the other variable.

p + m = 15

7 + m = 15

Subtract 7 to both sides:

m = 8

So he purchased 7 pineapples and 8 mangos.
4 0
4 years ago
10 meters wide with a surface area of 80 square meters. ​
Vlada [557]

Answer:

8

Step-by-step explanation:

5 0
3 years ago
noah is thinking of a number when i multiply it by 5 and subtract by 40 the answer is 50 what is the number
notka56 [123]
Well when you multiply it, it would equal 90 and 5*18 is 90 then you subtract 40 and you would get 50

SO YOUR ANSWER IS >>18<<
8 0
4 years ago
Read 2 more answers
It takes 10 workers 5 days to finish a road repair when working 2 hours a day! How many days would it take 2 people working it a
Tanzania [10]

Answer:

the answer is 10 days

Step-by-step explanation:

10 workers⋅5 days ⋅2 hoursday=100 worker-hours

2 workers ⋅5 hoursday=10 workers-hoursday

100 worker-hours⋅1 day10 worker-hours=10 days

3 0
2 years ago
Other questions:
  • Convert the radian measure to degrees. (Round to the nearest hundredth when necessary): 7π/3
    15·2 answers
  • The measure of the supplement of an angle is 12° less than twice the measure of the angle. What is the measurement, in degrees,
    15·1 answer
  • 2,036,017 expanded form exponents
    14·2 answers
  • Determine if the number is written in scientific notation. If not explain.
    15·2 answers
  • What is the solution to the following system of equations?
    10·1 answer
  • Solve: 2x - 3 = 2x - 5​
    6·1 answer
  • I WILL MARK! PLS ANSWER THIS.
    10·2 answers
  • A bag contains 2 white balls, 3 red balls and a black ball. if a ball is selected at random, what is the probability that it is
    9·2 answers
  • Mrs. Bell can grade 12 papers in 20 minutes. At this
    5·2 answers
  • Given that angle a = 72° and angle b = 37°, work out x.
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!