What is it you are asking?
2520 bolts
Explained:
If it starts working at 3 PM, and makes 900 nuts at the rate of 600 nuts per hour. 900/600 =1.5. So it stopped making nuts at 4:30.
Then it started making bolts at a rate of 720 per hour for 3.5 hours between 4:30 and 8:00pm. 720 x 3.5 = 2520 bolts
Answer:
Incorrect
Step-by-step explanation:
Multiplication is incorrect, the answer is actually 144
Answer:
B
Step-by-step explanation:
Given f(x) then f(x + a) is a horizontal translation of f(x)
• If a > 0 then a shift to the left of a units
• If a < 0 then a shift to the right of a units
g(x) =
is the graph of f(x) shifted 7 units to the right