I think it is 55 because 85-30 = 55
Hope this helps! :D
Answer:
a. 4.05 b. 3.84 c. 1.2475 and 1.1344 d. 1.1169 and 1.0651 e. We can say that the overall job satistaction of senior executives and middle managers is about 4; however, there is more variability in the job satisfaction for senior executives than in the job satisfaction for middle managers.
Step-by-step explanation:
a. (1)(0.05)+(2)(0.09)+(3)(0.03)+(4)(0.42)+(5)(0.41) = 4.05
b. (1)(0.04)+(2)(0.1)+(3)(0.12)+(4)(0.46)+(5)(0.28) = 3.84
c. We compute the variances as follow:
= 1.2475 and
= 1.1344
d. The standard deviation is the squared root of the variance, therefore, we have
and
e. The expected value of the job satisfaction score for senior executives is very similar to the job satisfaction score for middle managers. We can say that the overall job satistaction of senior executives and middle managers is about 4; however, there is more variability in the job satisfaction for senior executives than in the job satisfaction for middle managers.
Answer:
200 minutes
Step-by-step explanation:
In order to find the range, you have to subtract the greatest number to the lowest number. In this case, 400 is the smallest number, and 600 is the greatest number. 600-400 is 200 minutes.
Answer:
Area = 35
Step-by-step explanation:
Triangle formula= Base x Height divided by 2.
The base is the distance between the x-axis(-4 and 6) which is 10.
The height is the y axis distance(2 and 9) which is 7.
10 x 7 = 70
70/2 = 35