Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.
Ffkjlfdhaslkjfhlaksdfhlkajsdfh
Answer: Scope resolution operator(::)
Explanation: A member function and the constructor can be called within the function easily but for the execution of the these components outside the class , a special operator is required to call the functions. The scope resolution operator(::) preceding with the name of class is thus used for defining of the function outside class.This operator maintains the cope of the function and constructor outside the class.
Answer:
education purposes
Explanation:
Education institutes make some programs like School of the Air and College of the Air, forums, and discussion tables, in 1940 the FCC reserved a range of the FM radio spectrum for education purposes.
Although FM was unpopular when the FCC moved the FM bandwidth to a higher set of frequencies, and people and consumer stations had to buy new equipment.
Administrative, Billing data and progress notes. Also Patient Demographics.