In one hour a software engineer will write 250 lines of code.
Given that, a software engineer has the capability of thinking 100 lines of code in five minutes and can type 100 lines of code in 10 minutes.
1st 5 minutes = He thinks the code
2nd 5 minutes = He writes the code
3rd 5 minutes = Break
4th 5 minutes = Write [ because he can type up to 10 minutes if he thinks for 5 minutes ]
5th 5 minutes = Think [ He has completed 10 minutes of writing so he has to think ]
6th 5 minutes = Break
7th 5 minutes = He writes the code
8th 5 minutes = He writes the code
9th 5 minutes = Break
10th 5 minutes = He thinks the code
11th 5 minutes = He writes the code
12th 5 minutes = Rest [ he has completed his 10 minutes of working.
5 minutes thinking + 5 minutes writing ]
Therefore, in one hour a software engineer will write 250 lines of code.
To learn more about the unitary method visit:
brainly.com/question/22056199.
#SPJ4