Answer:
Answer:the the opening balance is =26041the total receive were=39567the the bank balance if opening=13526.
Explanation:
A turnkey project includes construction up to but not including actual production. Option B. This is further explained below.
<h3>What is
construction?</h3>
Generally, construction is simply defined as the process of erecting a building.
In conclusion, The building process, but not the manufacturing itself, is included in a turnkey project.
Read more about construction
brainly.com/question/8606089
#SPJ1
Answer:
37.7 hours
Explanation:
Calculation to determine what The delivery cycle time was:
Using this formula
Delivery cycle time=Wait time +Throughput time
Where,
Wait time=28.0
Throughput time=Process time 1.0+ Inspection time 0.4+ Move time 3.2 +Queue time 5.1=9.7
Let plug in the formula
Delivery cycle time=28.0+9.7
Delivery cycle time=37.7
Therefore Delivery cycle time was 37.7
Answer:
a. under applied.
Explanation:
For computing, whether it is under applied or over applied first, we have to compute the predetermined overhead rate. The formula is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)
Now we have to find the applied overhead which equal to
= Actual direct labor-hours × predetermined overhead rate
So, the ending overhead equals to
= Actual manufacturing overhead - applied overhead
= under-applied
If actual overhead is more than the applied overhead