To create a chart, you need to select at least two cells in a range of data.
two cells
<u>Explanation:</u>
In MS excel end user can create graph through insert menu and select chart. In MS excel end user should have enough data in each cells to generate graphs.
In MS EXCEL end user can create bar graph, pie chart, and line graph. Normally graph means comparing either two sets of values or range of values.
If we select one value it is just graph which gives performance data.
Purpose of graph is to do analysis in graphical presentable manner which an organization can under visual rather than comparing values.
It's Microsoft office power point presentation.
Answer:
numX = 3
Explanation:
First, let's analyze what the code is showing:
If both conditions in the if-statement are true, then numX = 3. If one or both conditions are false, then numX = 7 ('and' means that both conditions have to be true for the if-statement to become true).
- this statement is true.
!=
- this statement is also true (!= means 'not equal').
Since both conditional statements are true, then numX must equal
.
Hope this helps :)
Answer: b)It helps to engage workers in continuous improvement activities.
Explanation: Poke-yoke method was the technique to eliminate the mistakes that happen in a manufacturing process. It helps in avoiding the issues in the product and correcting those errors.
Mistake proofing is the mechanism of this methods that ensures about the product manufactured is safe from any failure and defects.It alerts the workers to improve the product through their working.
Other options are incorrect because it was developed by Shigeo Shingo , they had easy mechanism and feedback system did not told the workers about defects.Thus, the correct option is option(b).