4.58% is the answer. You need to add the $12.10 to $252 to get the total. 252x100%=2500÷264.10 then subtract the answer from 100.
Answer:
(-∞, -5/2) ∪ (1, ∞)
Step-by-step explanation:
"Increasing" means the graph goes up to the right. It is increasing from the left up to the local maximum--the peak at left.
It is increasing again from the local minimum on the right to the right side of the graph.
The two sections where the graph is increasing are ...
(-∞, -5/2) ∪ (1, ∞)
__
The graph is <em>decreasing</em> between the maximum on the left and the minimum on the right.
Answer:
Step-by-step explanation:
F(x) = 2 - x²
First we calculate the volume of the foundation:
Volume (V) = 20 ft * 12 ft * 4 in (1 ft / 12 in)
V = 80 ft^3
Since the cost is in cubic yard (yard^3) so convert:
V = 80 ft^3 * (1 yard^3 / 27 ft^3) = 2.963 yard^3
So the total cost is:
cost = ($125 / yard^3) * 2.963 yard^3
<span>cost = $370.37</span>