Answer:
Cost to construct the road = 775000 rupees
Step-by-step explanation:
Square field has a side = 150 m
Area of the field = (Side)²
= (150)²
= 22500 m²
Length of the park with road around the field = 150 + 2×(width of the road)
= 150 + (2×5)
= 160 m
Similarly, width of the park with road around the field = 160 m
Area of the park with road = (Side)²
= (160)²
= 25600 m²
Area of road = Area of the park with road - Area of the park
= 25600 - 22500
= 3100 m²
Since, cost of constructing the road = 250 rupees per square meter
Cost to construct the road with the given area = 250 × 3100
= 775000 rupees
Answer:
################
Step-by-step explanation:
Answer:
volume left in A is 80ml
Step-by-step explanation:
let original volume in both be x ml
after pouring from A to B
vol in A = x - 120
vol in B = x + 120
now it is given that
vol in B = 4 times vol in A
implies

hence original volume in A is 200ml. after pouring in B it is 200-120 = 80 ml
Step-by-step explanation:
the rate of change is officially
(f(x2) - f(x1)) / (x2 - x1)
but for a line function (as we have here) this is totally easy : it is the slope of the line.
and that means it is the factor of x.
in our case this is -3/2.
because the slope of a line is the ratio "y coordinate change / x coordinate change". and that is exactly corresponding to the general rate of change definition above.
Answer:
9, 9x, 18x
Step-by-step explanation:
Hence the B. I hope this helps love!