Answer:
Space layout and function
Explanation:
The three dimensions of servicescape include:
- Ambient conditions: air quality, room temperature, smell, music, lighting, etc.
- Space layout and function: how equipment and furniture are laid out and arranged.
- Signs, symbols and artifacts: corporate logos, decoration styles (including color), signs, etc.
Answer:
$65,332
Explanation:
The computation of revenue in 2021 is shown below:-
Revenue for the year 2021 = New franchisee received + Received by Top chop × (From July 1 to Aug 1 ÷ 2)
= $62,000 + $40,000 × 1 ÷ 2
= $62,000 + $40,000 × 0.5
= $62,000 + $20,000
= $82,000
Therefore, the revenue recognized for its arrangement is $82,000 and the new franchisee fee instantly recorded as an income
Answer:
Explanation:
The adjusting entry is shown below:
Deferred Subscription Revenue A/c Dr $12,000
To Subscription revenue A/c $12,000
(Being the deferred subscription amount is adjusted)
The computation is shown below:
= Number of subscriptions sold × sale price each × (number of months ÷ total number of months in a year)
= 400 subscriptions × $90 × (4 months ÷ 12 months)
= $36,000 × (4 months ÷ 12 months)
= $12,000
The four months are reported from the September 1 to December 31
Answer:
The production range between 1120,000 and 150,000 is called Relevant range
correct option is c) relevant range
Explanation:
given data
normally produces = 120,000 to 150,000 units
to find out
The production range between 1120,000 and 150,000 is called
solution
The production range between 1120,000 and 150,000 is called Relevant range because there are 2 point
- if Craft, Inc. need to reduce fixed expenses then production volume is reduce less than 120000 unit
- if Craft, Inc. need to increase fixed expenses than production volume is increases more than 150000 unit
and if expected fixed expenses will not change than the production volume is 120000 units to 150000 units
so that production range between 1120,000 and 150,000 is called Relevant range
correct option is c) relevant range
Answer:
$2,880
Explanation:
Given that,
Total machine-hours = 30,300
Total fixed manufacturing overhead cost = $ 575,700
Variable manufacturing overhead per machine-hour = $ 4.00
For Job T687:
Number of units in the job = 10
Total machine-hours = 30
Direct materials = $730
Direct labor cost = $1,460
Total variable overhead estimated:
= Variable manufacturing overhead per machine-hour × Total machine-hours
= $4 × 30,300
= $121,200
Total overhead estimated:
= Total variable overhead estimated + Total fixed overhead estimated
= $121,200 + $575,700
= $696,900
Predetermined overhead rate:
= Total overhead estimated ÷ Total machine-hours
= $696,900 ÷ 30,300
= $23 per machine hour
Total overhead applied:
= predetermined overhead rate × Total machine hours for Job T687
= $23 × 30
= $690
Total job cost:
= Direct material + Direct labor + Total overhead
= $730 + $1,460 + $690
= $2,880