<h3><u>Question:</u></h3>
Serena uses chalk to draw a straight line on the sidewalk. The line is 1/2 ft long. She wants to divide the line into sections that are each 1/8 ft long. How many sections will the line be divided into?
<h3><u>Answer:</u></h3>
The number of sections that the line is divided is 4
<h3><u>Solution:</u></h3>
Given that, Serena uses chalk to draw a straight line on the sidewalk
The line is 1/2 ft long. She wants to divide the line into sections that are each 1/8 ft long
From given,

To find: Number of sections can be made
The number of sections that can be made is found by dividing the total length of line by length of each section

Substituting the values, we get,

Thus number of sections that the line is divided is 4
Answer:
12 hours
Step-by-step explanation:
Step one:
given data
base fee= $60
charge per hour= $15
let the number of hours the plumber work be x
the linear function for the charge is the equation of line.
that is y=mx+c
Step two:
given that y=$240
240=15x+60
240-60=15x
180=15x
divide both sides by 15 we have
x=180/15
x=12
<u>The number of hours is 12</u>
Answer:
Don't accept A-G
Accept only A-E
Step-by-step explanation:
The company would those projects with a return of return equal to or higher than its cost of capital of 10.45%
Project A with a 12% return is acceptable.
Project B with a 11.5% rate of return is also acceptable
Project C has a rate of return of 11.2% , hence acceptable.
Project D has 11% rate of return and it is therefore acceptable.
Project E has 10.7% return rate and it is acceptable.
Project F has a lower rate of return of 10.3%, hence rejected, as well as projects G
Answer:
7.25
Step-by-step explanation:
Given :
___________ Sample size __ sample mean
Treatment 1 ____ 5 _______ 4
Treatment 2 ____ 10 ______ 8
Treatment 3 ____ 5 _______ 9
Sample size = (5 + 10 + 5). = 20
Overall mean = ((5*4). + (10*8) + (5*9)) / 20
Overall mean = (20 + 80 + 45) / 20
= 145 / 20
= 7.25