Answer:
48.5 m/s
Step-by-step explanation:
291/6 = 48.5
Answer/Step-by-step explanation:
✔️Slope of the first graph:
Using two points on the line, (0, 1) and (3, 2),
Slope = ⅓
✔️Slope of the second graph:
Using two points on the line, (0, 0) and (1, 1),
Slope = 1
✔️Slope of the third graph:
Using two points on the line, (0, 1) and (2, 2),
Slope = ½
C = 40 + 0.17M
Total monthly charge = Fixed base fee + charge per minute*total number of minutes
C = 40 + 0.17*M
25
Given the function that represents the amount of mosquitoes as;
M(x) = -(x-5)² + 25
To get the maximum mosquitoes possible, we need to first find x;
At the maximum dM/dx = 0
dM//dx = -2(x-5)
0 = -2(x-5)
-2(x-5) = 0
-2x + 10 = 0
-2x = -10
x = 10/2
x = 5
Substitute x = 5 into the function;
M(5) = −(5−5)² +25
M(5) = 0+25
M(5) = 25
Hence the maximum number of mosquitoes is 25