The time at which the cost for the services of the two companies would be in exactly 6 days. If we would compare the two charges, we would see that company A just charges 40 per day while B has a charge of 60, which is a standard fee, and a rate of 30 per day. So if we compute 40 x 6, we will have a total cost now of 240. If we compute 30 x 6, we will have a total cost now of 180 plus 60 which is the standard fee, and we will get 240. So in 6 days, the rates of the two companies would both accumulate to 240.
Answer:
Step-by-step explanation:
Ok so the beaker is 200 water:800 acid
So she drains 100 from the acid and 100 from the water which equals
100:700
Then she adds 200 water:
300:700
there is 300 mL water in da beaker now
i might got it wrong tho
Using a right triangle formed by boat with base and top of lighthouse.Note: 15 minutes = 0.25 degreesLet d be distance the boat is from shore.tan(90−13.25)=d/175
d=175∗tan(76.75)=743.2
Answer: B
explanation: on y-axis you can see the line touches -8 on graph. for the slope, rise over run could be used 9/9 =1
so y=x-8