Answer:
B.O(1)
Explanation:
When we are implementing ADT stack using linked chain we can pop an entry from the stack having O(1) time complexity because in linked chain we have the head or top pointer in linked chain only.Popping and pushing in stack happens on only one end that is top.So we have move to move top in linked chain to the next and delete prev node.
The
USMT (User State Migration Tool) is designed to assist IT professional migrate
files to the windows OS. An example is a step by step migration of files and
settings from a windows XP environment to windows 8 using USMT. At the end of the day, you will have
used
LoadState a
ScanState to complete this end to end migration. The correct
order is as follows;
<span><span>
1. </span>
Gather Data Using the ScanState Tool</span>
<span>a)
</span>Install USMT
<span>b)
</span>Run ScanState to Create a Migration Store on the
Server
<span>2.
</span>Install Windows
<span>a)
</span>Install Applications
<span>3.
</span>Apply Data Using the LoadState Tool
<span>a) </span>Install the USMT
<span>b) </span> Run LoadState
The points a b c and d lie on a straight line ab:bd = 1:4 are A line that extends to infinity on both sides and has no curves is called a straight line.AB:BC=3:4.
<h3>What do you call a straight line? </h3>
A line is simply an object in geometry denoted as an object with no width that extends on both sides. A straight line is just a line with no curves.
- AC=AB+BC=3+4=7; AC:CD=2:1, i.e. AC=2; because we get 2 different lengths for AC, we change the given ratio AC:CD to an equivalent one with AC=7 .
- As follows: AC:CD = 2 : 1 = 7 : 3.5 (multiply both sides by 3.5 ) Now we have AC:CD = 7 : 3.5 and AD = AC+CD= 7+3.5 = 10.5,, and the answer is: the ratio BC:AD = 4:10.5.
Read more about the straight line:
brainly.com/question/3493733
#SPJ1