Answer:
The answer is option B) probable and the amount cannot be reasonably estimated.
Explanation:
Contingency liability is the likelihood that a liability might occur sometimes in the future in the face of uncertain circumstances. To validate a contingency liability, the fa cts presented has to be reasonably possible and reasonably estimated.
in the case of Marcellus Company, footnote disclosure of the contingent liability which could arise does not have to be presented if the probability of Marcellus owing money as a result of the lawsuit is probable and the amount cannot be reasonably estimated.
Explanation:
10%×1.2+30%×0.8+40%×1.1+20%×1.5=12%+24%+44%+30%=1.1?
A loan that is paid back in a single lump sum payment at the due date of the loan is commonly called a balloon loan.
Loans that do not completely amortize throughout their terms are known as balloon loans. A balloon payment is necessary to pay off the loan's remaining principal balance because it hasn't been fully amortized by the time the term is up.
Because they often have lower interest rates than loans with longer maturities, balloon loans might be alluring to short-term borrowers. There is a chance that the loan could reset at a higher interest rate, therefore the borrower must be mindful of refinancing risks.
The loans with balloon payments are mortgages the most frequently. Usually, between five and seven years long, balloon mortgages have short periods.
To learn more about balloon loans refer to:
brainly.com/question/14175239
#SPJ4
Answer:
- Tax liability = $24,222.50
- Marginal rate = 24%
- Average rate = 19.35%
Explanation:
Question requires that we find the Tax liability, Marginal rate and Average rate.
Tax liability:
Chandler is in the $84,200 to $160,725 bracket.
= 14,382.50 + 24% * (125,200 - 84,200)
= 14,382.50 + 9,840
= $24,222.50
Marginal rate = 24%
Chandler's bracket is the 24% bracket.
Average rate:
= Tax/ Taxable income
= 24,222.50 / 125,200
= 19.35%
Answer:
TFC : Horizontal Line parallel to X axis
TVC : Upward sloping inverse S shape curve from origin
TC : Upward sloping increase S shape curve, with Y axis intercept = TFC
Explanation:
Total Fixed cost [TFC] is the total production expenditure, done on fixed factors of production (Eg - on machine, building etc). It is incurred even at zero level of output, stays same (constant) irrespective of output level. So, it's curve is a constant horizontal line.
Total Variable Cost [TVC] is the total production expenditure, done on variable factors of production (Eg - on raw material). It is zero at zero level of output, directly related to level of output thereafter. It first increases at a decreasing rate, then increases at an increasing rate. So, it's curve is inverse S upward sloping curve from origin.
Total Cost [TC] is the total cost incurred on all factors of production (fixed & variable). It is sum of TVC & TFC. As TFC is constant at all levels of output, TC changes due to change in TVC. So, TC is also directly related to output level, first increases at increasing rate & then at decreasing rate. Hence, it is also a inverse S upward sloping curve. But, it also includes constant TFC. So, the curve has intercept on Y axis = TFC (it doesn't start from origin).