Answer:
Optimistic duration
Explanation:
The following three concepts are Project management concepts:
Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.
Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc
Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.
Which of the following is the estimate of the minimum amount of time it would take to perform a task?
The answer is Optimistic duration
<span> 13,000 is the same as 1.3 x 10^4</span>
Answer:
Explanation:
First take the input of the numbers:
x = int(input("Enter the number of elements to be in the list:"))
b=[ ]
for i in range(0,x):
a=int(input("Element: "))
b.append(a)
c=[ ]
d=[ ]
for i in b:
if(i%2==0):
c.append(i)
else:
d.append(i)
c.sort()
d.sort()
count1=0
count2=0
for k in c:
count1=count1+1
for j in d:
count2=count2+1
print("Largest even number:",c[count1-1])
print("Largest odd number",d[count2-1])