Given the following data;
Force = 3000 Newton
Distance = 15 m
To find the work performed by the crane;
The work done by an object or body is calculated by multiplying the force acting on the object with the distance covered by the object.
Mathematically, work done is given by the formula;
Work done = force * distance
Substituting the values into the formula, we have
Work done = 3000 * 15
Work done = 45,000 Nm
In conclusion, the work performed by the crane is 45,000 Nm.
Layer B would 'be'(get it??) would be the oldest of the two because it came before layer D. The second part to the question I don't understand.
Uniformitarianism
fossils
radioactive decay
48 million
after
The youngest age of the shale is 910 ka. According to the principle of inclusions, the shale formed before the tephra, so the tephra must be younger than 910 ka.
Answer:
The Bulk density = 1.3 g/cm³
the porosity of the sample is 132 cm³
Explanation:
Given:
Volume of cylinder = 260 cm³
Mass of container and the soil = 403 g
Mass of the empty container = 65 g
Thus,
The mass of the soil is = 403 - 65 = 338 g
Now,
The Bulk density = 
or
The Bulk density = 
or
The Bulk density = 1.3 g/cm³
also,
average particle density for mineral soil is usually given as 2.65 g/cm³
i.e the air present in the given soil sample has reduced its density from 2.65 g/cm³ to 1.3 g/cm³
The mass of the whole sample = Volume × Density
= 260 × 2.65
= 689 gm
but,
The actual mass of the dry sample = 338 g
thus,
Mass of air in the sample = 689 - 338 = 351 g
Therefore,
the volume of 351 g soil =
=
= 132.45 cm³