<span>They should produce 100 Explorers and 275 Grande Expeditions.
To maximize revenue, we want to use all 375 frames. Since the more expensive bike take longer to make, we also want to use all 450 hours so we can make as many of the more expensive bikes as possible with the 375 frame. This helps us create a 2 variable system that can be solved.
Let x=Explorers and y=Grande Expeditions
x+y=375
2x+3y=450</span>
Answer:
(0, -10/3)
the -10 is over the 3 in the form of a fraction
Using a graphing calculator you can find that the maximum is 1038, so the profit starts to decline at the t value for <span>1038</span>, which is 31
852 and because I said so
Answer:
3.81 inches
Step-by-step explanation:
πr² + 100 = π(r+3)²
divide by π and simplify:
r² + (100/π) = r² + 6r + 9
100/π = r² + 6r + 9
31.8309886184 - 9 = r² +6r
r² = 6r - 22.8309886184
0 = 6r - 22.8309886184
22.8309886184 = 6r
divide by 6:
3.80516476973 ≈ 3.81 inches