9

A tire company has plants in Chicago and Detroit. The Chicago plant can make 600 radial and 100 standard tires per day. The Detr

oit plant can make 300 radial and 100 standard tires per day. It costs $4,000 per day to operate the Chicago plant and $3,000 per day to operate the Detroit plant. The company has a contract to make at least 24,000 radial and 5000 standard tires.
How many days should each plant be scheduled to minimize operating costs?

Mathematics
2 answers:
sdas [7]2 years ago
5 0

Answer:

<u>To minimize operating costs, the Chicago plant should work 30 days and the Detroit plant should work 20 days </u>

Step-by-step explanation:

1. Let's review the information given to us to answer the question correctly:

Chicago plant can produce:

  • 600 radial and 100 standard tires per day
  • Cost of daily operation = $ 4,000

Detroit plant can produce:

  • 300 radial and 100 standard tires per day
  • Cost of daily operation = $ 3,000

Contract to make at least 24,000 radial and 5000 standard tires.

2. How many days should each plant be scheduled to minimize operating costs?

  • Let C to represent the number of days the Chicago plant to work
  • Let D to represent the number of days the Detroit plant to work

We can write our system of inequalities, this way:

100C + 100D ≥ 5,000

600C + 300D ≥ 24,000

Isolating C:

100C  ≥ 5,000 - 100D

C  ≥ 50 - D (Dividing by 10 at both sides)

Substituting C and solving for D in the 2nd inequality:

600(50 - D) + 300D ≥ 24,000

30,000 - 600D + 300D ≥ 24,000

-300D ≥ 24,000 - 30,000

-300D ≥ - 6,000

D ≥ -6,000/-300

D  ≥ 20

Solving for C in the 1st inequality:

100C + 100 * 20 ≥ 5,000

100C + 2,000 ≥ 5,000

100C ≥ 5,000 - 2,000

100C ≥ 3,000

C ≥ 3,000/100

C ≥ 30

In consequence, the total costs of operating the plants would be:

30 * 4,000 + 20 * 3,000

120,000 + 60,000 = $ 180,000

melomori [17]2 years ago
4 0

Answer:

To minimize the cost, the Chicago plant should run 30 days and the Detroit plant should run 20 days.

Step-by-step explanation:

This is a linear programming question, in which there is a function to optimize (minimize cost) and restrictions, all linear functions.

The objective function is Cost:

C=4000H+3000D

C: cost function

H: days of operation for Chicago plant

D: days of operation for Detroit plant

The restrictions are:

- Minimum requirements for radial tires:

600*H+300*D\geq24,000

- Minimum requirements for standard tires:

100*H+100*D\geq5,000

- Days are positive integers

H,D\geq0

We have 3 points in which 2 of the constraints are saturated. In one of this three points is the minimum cost.

We will evaluate them to find the minimum cost:

Point 1: H=0, D=80

C=4,000*H+3,000*D\\\\C=4,000*0+3,000*80=240,000

Point 2: H=50, D=0

C=4,000*H+3,000*D\\\\C=4,000*50+3,000*0=200,000

Point 3: H=30, D=20

C=4,000*H+3,000*D\\\\C=4,000*30+3,000*20=120,000+60,000=180,000

The third point minimizes the cost.

To minimize the cost, the Chicago plant should run 30 days and the Detroit plant should run 20 days.

You might be interested in
Simplify 2(5+3x) + (x+10)
xz_007 [3.2K]

Answer:

7x + 20

I hope I helped :D

Step-by-step explanation:

8 0
2 years ago
Simplify 6 -square root of 15 divided by 2
egoroff_w [7]

Answer:

hjyfgtuygtfvfvhjkoijuhgytfrdetrft

Step-by-step explanation:

dcfgvhbjnkiouytrfdr

6 0
3 years ago
Two parallel lines were cut by a transversal. Which of the following
meriva

Answer:

B. a pair of alternate exterior angles with measures of 130° and 50°

Step-by-step explanation:

Alternate exterior angles formed when two parallel lines are cut across by the same transversal line, are said to be congruent.

Therefore, a pair of alternate exterior angles cannot have different angle measures of 130° and 50°. Rather, both alternate exterior angles should be of equal measure of degree.

All other scenarios are possible result except option B: "a pair of alternate exterior angles with measures of 130° and 50°".

7 0
3 years ago
Write an expression to<br> represent the perimeter of<br> the rectangle:<br> 3* +10<br> * +5
Schach [20]

Answer:

the perimeter is 18

Step-by-step explanation:

3 0
3 years ago
Write the equation of the line fully simplified slope-intercept form. ​
Vladimir [108]
Y=-2/3x-5
i think is the answer
4 0
3 years ago
Other questions:
  • Answer the following question. Please show your work.
    12·1 answer
  • Solve for the inverse of the following function:<br><br> f(x)=4x-16
    13·1 answer
  • Find two ratios that are equivalent to 2/12
    7·1 answer
  • F(x)= x^2 . What is g(x)?
    15·1 answer
  • What is 55% of 134? pls help
    14·1 answer
  • 6 A loaf of bread has a mass of x kg. What is its<br>mass in grammes?​
    7·1 answer
  • Solve for x pls helppppp
    12·1 answer
  • Find the equation of a line that has the same slope as y = 5 - 9x and the same y-intercept as y=-8x - 10. ​
    11·2 answers
  • What is the length of the longest side of the triangle if the left side is 2x+12 and the bottom number is 6x-2 and the right sid
    6·1 answer
  • PLEASE HELP! ILL GIVE BRAINLIEST!I! I uploaded a picture below.
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!