Answer:
f(6)=24
Step-by-step explanation:

The materials were charged at a loading charge of 80.00% of their cost.
The total charge was $720 and included both the material charge and the labor charge.
The first thing to do is therefore find out the cost of the materials without the labor charge:
<em>= Total cost - labor charge</em>
= 720 - (6 labor hours x 75 per labor hour)
= 720 - 450
= $270
The total cost of materials is $270. To find the material loading charge, use the formula:
<em>= (Total cost of materials - Cost of materials used) / Cost of materials used x 100%</em>
= (270 - 150) / 150 x 100%
= 120 / 150 x 100%
= 80%
In conclusion, the material loading charge was 80.00%.
<em>Find out more at brainly.com/question/23089262.</em>
Answer:
15
Step-by-step explanation:
The mean is basically the average. To find it, we add up all the numbers and then divide that sum by the number of numbers.
Here, we need to find the sum: 7 + 8 + 9 + ... + 22 + 23. To do so, we can use the formula:
, where a_1 is the first number (7 in this case), a_n is the last number (23 in this case), and n is the number of numbers (23 - 7 + 1 = 17 numbers in this case). So:
is the sum.
Now, we need to divide 255 by the number of numbers, which is 17: 255/17 = 15.
Thus, the mean is 15.
Hope this helps!
The answer is between 97 and 86.
The estimated answer is 89
answer for 9 is 6cm not sure about 10