Answer:
quarts
12 days
Step-by-step explanation:
Given that:
Amount of water leaked in 4 days = 3 quarts
To find:
Number of quarts leaked in 1 week?
Number of days taken for the leakage of 9 quarts of water?
Solution:
We can simply use unitary method or the ratio to find the answers of the questions asked in the statement.
As per question statement:
Amount of water leaked in 4 days = 3 quarts
Dividing by 4 on both sides:
Amount of water leaked in 1 day =
quarts
Multiplying by 7 on both sides:
Amount of water leaked in 7 days =
quarts
Number of days taken for the leakage of 3 quarts = 4 days
Multiplying by 3 on both sides:
Number of days taken for the leakage of 3
3 = 9 quarts = 4
3 = <em>12 days</em>
17/10
or 1 7/10
i did it on my calculator lol
Answer:
minimum
Step-by-step explanation:
Given a quadratic function in vertex form
f(x) = a(x - h)² + k
• If a > 0 then f(x) is a minimum
• If a < 0 then f(x) is a maximum
f(x) = 0.25(2x - 15)² + 150 ← is in vertex form
with a = 0.25 > 0
Thus f(x) has a minimum turning point
Answer:
I think it is C
Step-by-step explanation: