1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
emmainna [20.7K]
4 years ago
13

Help plZ and thanks​

Mathematics
1 answer:
sleet_krkn [62]4 years ago
7 0

Answer:

it would be the one over six

Step-by-step explanation:

there are three possibilities out of eighteen so it would simplify to one over six  

You might be interested in
A line with slope 3 passes through the point (0,10). What is the y-coordinate of the point on the line with x-coordinate 2?
lana [24]
Hello!

So to find the y-coordinate we need an equation for the line. The equation we can use is

y = mx + b

In this we already know m(the slope which is 3) and we can find b by plugging in the points that are given.

10 = 3(0) + b
10 = 0 + b
10 = b

So now that we've found b, we can use this in our equation

y = 4x + b

So now we can plug in the x-coordinate that we know (2) and find the y - coordinate.

y = 4(2) + 10
y = 8 + 10
y = 18

18 is your y-coordinate 
4 0
4 years ago
15 points
Alex Ar [27]

Answer

The last option offers the most precision.

8 0
4 years ago
Read 2 more answers
Show works please and do all of them for the 40 please because I need help
raketka [301]

Answer:

6 - Not similar

7 - Similar, 2x factor

8 - Similar, 3x factor

9 - Similar, 3x factor

10 - Not similar

11 - Similar, 5/3x factor

12 - x = 15

      y = 25

      z = 115

Step-by-step explanation:

8 0
3 years ago
A masonry contractor is preparing an estimate for building a stone wall and gate. He estimates that the job will take a​ 40-hour
kodGreya [7K]

Solution: Estimated time for the work is 40 hour work week.

Estimated payment to 3 laborers working 40 hours at cost $14 per hour is:

3\times 40\times 14= $1680

Estimated payment to 6 masons working 40 hours at cost $24 per hour is:

6\times 40\times 24= $5760

Estimated cost of material = $3143

Contractor wishes to make a profit of $500

Therefore, the mathematical expression that will give the estimated cost of the job is:

Cost = 1680+5760+3143+500

The estimated total cost is:

Cost =$11083




5 0
3 years ago
Read 2 more answers
Find the area of a rectangle with a length of 5 1/3 inches and a width of 2/3 inch
neonofarm [45]

Step-by-step explanation:

length \: of \: rectangle \\ l = 5 \frac{1}{3} \:  inches =  \frac{16}{3}  \:inches  \\  \\ width \: of \: rectangle \:  \\ w =  \frac{2}{3}  \: inch \\  \\ area \: of \: rectangle \\  = l \times w \\  \\  = \frac{16}{3}  \times \frac{2}{3} \\  \\  =  \frac{32}{9}  \\  \\ \red{ \boxed{  \therefore  area \: of \: rectangle = 3 \frac{5}{9}  \:  {inch}^{2} }}

4 0
3 years ago
Other questions:
  • There are 67 toy animals in the store. Then the clerk sells 19 toy animals. How many toy animals are in the store now? Describe
    7·2 answers
  • A group of 18 people ordered soup and sandwiches for lunch. Each person in the group either ordered one soup or one sandwich . T
    12·1 answer
  • You draw a card at random from a deck that contains 3 black cards and 7 red cards.
    14·1 answer
  • Which statements about pentagons and hexagons are real?
    11·1 answer
  • One-third of a number increased by 8 is 37
    14·1 answer
  • lisa is painting a fence that is 26 feet long and 7 feet tall. a gallon of paint will cover 350 aquare feet. write and slove a p
    14·1 answer
  • I'll give u full brainlist if u do this!
    9·1 answer
  • A single card is drawn from a standard 52 card deck.
    10·1 answer
  • 7. Consider the inequality below. PART A: Select all values of x that make the inequality true. *
    7·1 answer
  • Help help help help!!!!!
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!